Simulation Working Group (SimWG)
Access: Full
members
Contact: sim-wg-chairs[at]lisamission.org
Brief Description
The goal of the Simulation Working Group is to study and develop the LISA End-to-End Performance simulator, and any other useful sybsystem simulator, in order to test the mission performance of the LISA observatory. This group is part of the LDPG.
Working Groups activities
The work has been organized into Working Groups (WG), each one with its own deliverables and tasks. Each WG is usually linked to a specific LISA instrument or subsystem, or to simulation management activities.
The Working Groups scopes and content are described below:
-
WP1 - Requirements and Design
-
WP2 - TDI Implementation and Validation
-
WP3 - Clock Noise Simulation
-
WP4 - TM and SC Dynamics Simulation
-
WP5 - LISA Orbits
-
WP6 - Telescope and Optical Bench Simulation
-
WP7 - Laser Assembly and RIN Simulation
-
WP8 - Phasemeter Simulation
-
WP9 - Impact of instrument performance on science
-
WP10 - On-ground pre-processing
-
WP11 - Environmental Effects
-
WP12 - Frequency Plan
-
WP13 - TDI Ranging
SimWG delivered products
Here, the main products delivered by the Simulation Working Group will be listed. When available or allowed, a link to the download the document will be provided
Technical Notes
-
Papers
-